AT A GLANCE
BILLING- YOU SEND
- Once: the BOQ and construction drawings. Every month: what got built, any revised drawings and site instructions.XLSBOQ and contract ratesPDFConstruction drawingsXLSMonthly progress
- WE SEND BACK
- Measurement sheets for every item built, the bill abstract with previous and cumulative quantities, extra items with backup, and replies to the engineer's queries.
- TURNAROUND
- Within 3 working days of your monthly cut-off.
- HOW IT’S PRICED
- A setup fee per project, then a fixed monthly fee per project. Final bills and close-out are quoted separately.
- HOW TO START
- A bill recovery check: we review your last certified bills against the drawings and show what was built but not billed.
Our AI does the first pass and marks anything it isn’t sure of. An engineer resolves every marked item and signs the work off.
Send a projectMEASUREMENT SHEET · RA BILL 07SIGNED OFF
ITEMLOCATIONNOSQTY
2.3Footing F1, grid A1–A4413.82 m³
2.3Footing F2, grid B1–B4410.58 m³
2.3Less opening, grid B2-1-0.15 m³
WHAT IT CAN INCLUDE
01
Quantity bank
At the start, the whole project measured once by location — every footing, slab and drain run — so each month's bill is quick and consistent.
02
Measurement sheets
Every item built that month, line by line: location, drawing, dimensions, deductions and quantity, with the formulas visible for the client's engineer.
03
Bill abstract
Totals by BOQ item with previous, this month and cumulative quantities, ready to submit as the running bill or interim payment application.
04
Extras and changes
Extra items, quantities above the BOQ and changes from revised drawings, each with its backup, so they are claimed, not lost.
QUESTIONS04