Arched.

Jasper County Bridge Replacement

TxDOT CSJ 0920-12-049 & 0920-13-039

Engineering optimization case study — $190K–380K estimated savings, 40–70 day schedule reduction across 4 structural and sequencing optimizations.

View Case Study

Ready to optimize?

Book a Call

AI-Powered Engineering Optimization — arched.ai